ROOF DRIP SIDE FINISH MOULDING(for Hatchback) INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedure for the RH and LH sides.

  • The procedure described below is for the LH side.

PROCEDURE


  1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP (for Standard Roof)

    Note

    When installing new No. 1 roof drip side finish moulding clips, remove the double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the body and clean the body with non-residue solvent.


    1. A00Y8IZC05
      *a Adhesive
      *b 2 to 3 mm bead of adhesive

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)

    2. A00YABAC02
      *a Protruding part

      Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

      Standard Dimension
      Dimension Measurement
      A 3.9 mm (0.154 in.)
      B 4.0 mm (0.157 in.)
      C 2.4 mm (0.0945 in.)
      D 1.5 mm (0.0591 in.)
      E 3.4 mm (0.134 in.)
      F 3.6 mm (0.142 in.)
      G 2.6 mm (0.102 in.)
      H 1.2 mm (0.0472 in.)
    3. Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.

      Tech Tips


      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  2. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP (for Glass Roof)

    Note

    When installing new No. 1 roof drip side finish moulding clips, remove the double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the body and clean the body with non-residue solvent.


    1. A00Y8IZC03
      *1 Adhesive
      *a 2 to 3 mm bead of adhesive

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)

    2. A00Y6HWC02
      *a Protruding part

      Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

      Standard Dimension
      Dimension Measurement
      A 4.0 mm (0.157 in.)
      B 4.0 mm (0.157 in.)
      C 2.4 mm (0.0945 in.)
      D 1.5 mm (0.0591 in.)
      E 3.4 mm (0.134 in.)
      F 3.6 mm (0.142 in.)
      G 2.6 mm (0.102 in.)
      H 1.2 mm (0.0472 in.)
    3. Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.

      Tech Tips


      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  3. INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING (for Standard Roof)


    1. A00Y94Q

      Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.

  4. INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING (for Glass Roof)


    1. A00Y7K5

      Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.