FRONT CONSOLE BOX(for Hatchback, Wagon) INSTALLATION

PROCEDURE


  1. INSTALL REAR CONSOLE BOX ASSEMBLY


    1. A01LYND

      Engage the 4 guides as shown in the illustration.

    2. for Manual Transaxle:


      1. Install the rear console box assembly with the 2 bolts and 2 screws.

    3. for CVT:


      1. Install the rear console box assembly with the 2 bolts and 4 screws.

  2. INSTALL CONSOLE BOX CARPET


    1. Install the console box carpet.

  3. INSTALL REAR CONSOLE BOX COVER (w/o Power Outlet Socket)


    1. Install the rear console box cover.

  4. INSTALL UPPER CONSOLE PANEL


    1. A01LV53

      Engage the 2 claws, 5 clips and 2 guides to install the upper console panel as shown in the illustration.

    2. A01M3G7

      Engage the clamp.

  5. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY


    1. Connect each connector.

    2. A01M086

      Engage the 4 claws and 5 clips to install the upper console panel sub-assembly.

  6. INSTALL SHIFTING HOLE BEZEL (for CVT)


    1. Engage the 2 guides.

    2. Engage the 6 claws to install the shifting hole bezel.

  7. INSTALL SHIFTING HOLE BEZEL (for Manual Transaxle)


    1. Engage the 2 guides.

    2. Engage the 6 claws to install the shifting hole bezel.

  8. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle)


    1. A01LZBZ

      Turn the shift lever knob sub-assembly clockwise and install the shift lever knob sub-assembly.

  9. INSTALL FRONT NO. 2 CONSOLE BOX INSERT


    1. A01LXN6C01
      *a Guide <A>
      *b Guide <B>

      Push the front No. 2 console box insert in the direction indicated by the arrow (1) to engage the guide <B>.

    2. Push the front No. 2 console box insert in the direction indicated by the arrow (2) to engage the claw, 3 clips and guide <A> to install the front No. 2 console box insert.

  10. INSTALL FRONT NO. 1 CONSOLE BOX INSERT


    1. A01LZG8C01
      *a Guide <A>
      *b Guide <B>

      Push the front No. 1 console box insert in the direction indicated by the arrow (1) to engage the guide <B>.

    2. Push the front No. 1 console box insert in the direction indicated by the arrow (2) to engage the claw, 3 clips and guide <A> to install the front No. 1 console box insert.

  11. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL

    Click here