PROCEDURE
INSTALL COMBINATION METER ASSEMBLY
Connect each connector.
Engage the 2 clips as shown in the illustration.
Install the combination meter assembly with the 2 screws.
INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL
INSTALL NO. 1 METER HOOD CLUSTER
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.