PROCEDURE
INSTALL BRAKE ACTUATOR ASSEMBLY
Install the brake actuator assembly to the brake actuator bracket assembly with the bolt and 2 new nuts.
Note
Do not remove the hole plugs of a new brake actuator assembly before connecting the brake lines because the brake actuator assembly is filled with brake fluid.
Do not hold the brake actuator assembly by the connector.
Tighten the bolt and 2 nuts in the order shown in the illustration.
INSTALL BRAKE ACTUATOR WITH BRACKET
Install the brake actuator with bracket to the vehicle body with 3 new nuts.
Note
Do not damage the brake lines, fuel lines or wire harness.
Tighten the 3 nuts in the order shown in the illustration.
Engage each clamp to install the No. 2 fuel tube clamp and front No. 4 brake tube to the brake actuator bracket assembly.
Note
Do not damage the brake lines or fuel lines.
| *a | for LHD: From 1st Chamber of Master Cylinder Sub-assembly for RHD: From 2nd Chamber of Master Cylinder Sub-assembly |
| *b | for LHD: From 2nd Chamber of Master Cylinder Sub-assembly for RHD: From 1st Chamber of Master Cylinder Sub-assembly |
| *c | To Front Wheel Cylinder Assembly RH |
| *d | To Rear Wheel Cylinder Assembly LH |
| *e | To Rear Wheel Cylinder Assembly RH |
| *f | To Front Wheel Cylinder Assembly LH |
Temporarily tighten each brake line to the correct position on the brake actuator assembly as shown in the illustration.
Using a union nut wrench, fully tighten each brake line.
Note
Use the formula to calculate special torque values for situations where the union nut wrench is combined with a torque wrench.
Engage the clamp to install the wire harness to the brake actuator bracket assembly.
Connect the connector to the brake actuator assembly and disengage the claw (b).
Pull the lever down and engage the claw (a) to engage the connector lock.
Note
Make sure that the connector is locked securely.
Make sure that the actuator connector can be connected smoothly. Do not allow water, oil or dirt to enter.
Connect the connector to the ECM.
for 1NR-FE: Click here
for 1ZR-FAE: Click here
INSTALL AIR CLEANER BRACKET (for 1AD-FTV, 1ND-TV)
Install the air cleaner bracket with the 3 bolts.
INSTALL FUEL FILTER SUPPORT (for 1AD-FTV, 1ND-TV)
Install the fuel filter support with the 3 bolts.
Engage the wire harness clamp to the fuel filter support.
INSTALL GLOW PLUG RELAY ASSEMBLY (for 1AD-FTV, 1ND-TV)
Install the glow plug relay assembly to the fuel filter support with the bolt.
Connect the wire harness clamp to the fuel filter support.
CONNECT WIRE HARNESS (for 1AD-FTV, 1ND-TV)
Connect the ECM connector to the ECM.
for 1AD-FTV: Click here
for 1ND-TV: Click here
Connect the 3 wire harness clamps to the fuel filter support.
INSTALL FUEL FILTER ASSEMBLY (for 1AD-FTV, 1ND-TV)
for 1AD-FTV: Click here
for 1ND-TV: Click here
INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1NR-FE)
INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1NR-FE)
INSTALL NO. 1 ENGINE COVER (for 1NR-FE)
INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1ZR-FAE)
INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1ZR-FAE)
INSTALL NO. 2 CYLINDER HEAD COVER (for 1ZR-FAE)
INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1AD-FTV)
INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1AD-FTV)
INSTALL NO. 1 ENGINE COVER (for 1AD-FTV)
INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1ND-TV)
INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1ND-TV)
INSTALL NO. 1 ENGINE COVER (for 1ND-TV with No. 1 Engine Cover)
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
BLEED AIR FROM FUEL SYSTEM (for 1AD-FTV, 1ND-TV)
for 1AD-FTV: Click here
for 1ND-TV: Click here
INSPECT FOR FUEL LEAK (for 1AD-FTV, 1ND-TV)
for 1AD-FTV: Click here
for 1ND-TV: Click here
BLEED BRAKE SYSTEM
INSPECT BRAKE ACTUATOR USING GTS
PERFORM SYSTEM VARIANT LEARNING (w/ VSC)
CHECK FOR AND CLEAR DTCS