TRANSMISSION CONTROL CABLE INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Pass the transmission control cable assembly into the vehicle and install the transmission control cable assembly to the body using the 2 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. Install the transmission control cable assembly to the rear engine mounting insulator with the bolt.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    3. Install the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

    4. A01LZ1GC05
      *a P Position
      *b N Position

      Turn the lever clockwise until it stops, then turn it counterclockwise 2 notches.

    5. Install the transmission control cable assembly onto the control shaft lever with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    6. Turn the nut of the transmission control cable assembly 180° counterclockwise. While holding the nut in place, push in the stopper until it clicks twice.

      A01M04XC02
      *1 Stopper *2 Nut
      *a Push in - -
    7. Install the outer part of the transmission control cable assembly to the shift lever assembly. Check that the spring is positioned at "A" and push in the stopper.

      A01M1SQC01
      *1 Shift Lever Assembly *2 Stopper
      *3 Spring *4 Nut
      *a Push in - -

      Note


      • If the stopper cannot be pushed in, slightly turn the nut clockwise and then push in the stopper again.

      • Make sure that the transmission control cable assembly is securely locked.

    8. A01LWQQ

      Install the end of the transmission control cable assembly to the shift lever assembly.

      Note


      • Install the end of the transmission control cable assembly all the way to the base of the pin.

      • Install the end of the transmission control cable assembly so that its adjustment lock section is on the driver side.

  2. ADJUST SHIFT LEVER POSITION

    Click here

  3. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR


    1. Install the front No. 1 floor heat insulator to the body with the 3 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
  4. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Front and Rear Catalyst) (for 1ZR-FE)

    Click here

  5. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Front and Rear Catalyst) (for 2ZR-FE)

    Click here

  6. INSTALL FRONT CENTER FLOOR BRACE (for 1ZR-FE)

    Click here

  7. INSTALL FRONT CENTER FLOOR BRACE (for 2ZR-FE)

    Click here

  8. INSTALL BATTERY CARRIER ASSEMBLY (for 1ZR-FE)

    Click here

  9. INSTALL BATTERY CARRIER ASSEMBLY (for 2ZR-FE)

    Click here

  10. INSTALL BATTERY (for 1ZR-FE)

    Click here

  11. INSTALL BATTERY (for 2ZR-FE)

    Click here

  12. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1ZR-FE)

    Click here

  13. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 2ZR-FE)

    Click here

  14. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1ZR-FE)

    Click here

  15. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 2ZR-FE)

    Click here

  16. INSTALL NO. 2 CYLINDER HEAD COVER (for 1ZR-FE)

    Click here

  17. INSTALL NO. 2 CYLINDER HEAD COVER (for 2ZR-FE)

    Click here

  18. INSTALL REAR CONSOLE BOX ASSEMBLY

    Click here

  19. INSPECT SHIFT LEVER POSITION

    Click here

  20. INSPECT FOR EXHAUST GAS LEAK