OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION OIL COOLER


    1. Apply Toyota Genuine CVT fluid FE to 2 new O-ring.

    2. Install 2 O-rings to the transmission oil cooler.

    3. Install the transmission oil cooler to the continuously variable transaxle assembly with the 3 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  2. CONNECT WATER BY-PASS HOSE


    1. Connect the 2 water by-pass hoses to the transmission oil cooler and slide the 2 clips to secure them.

      Note

      Fully insert the 2 water by-pass hoses until the 2nd rib on each oil cooler pipe.

  3. ADD ENGINE COOLANT

    Click here

  4. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

    Click here

  5. INSPECT FOR COOLANT LEAK

    Click here

  6. INSPECT FOR FLUID LEAK

  7. INSTALL REAR ENGINE UNDER COVER LH

    Click here

  8. INSTALL NO. 1 ENGINE UNDER COVER

    Click here