OIL COOLER REMOVAL

PROCEDURE


  1. REMOVE NO. 1 ENGINE UNDER COVER (for 1ZR-FE)

    Click here

  2. REMOVE NO. 1 ENGINE UNDER COVER (for 2ZR-FE)

    Click here

  3. REMOVE REAR ENGINE UNDER COVER LH (for 1ZR-FE)

    Click here

  4. REMOVE REAR ENGINE UNDER COVER LH (for 2ZR-FE)

    Click here

  5. DRAIN CONTINUOUSLY VARIABLE TRANSAXLE FLUID

    Click here

  6. DRAIN ENGINE COOLANT (for 1ZR-FE)

    Click here

  7. DRAIN ENGINE COOLANT (for 2ZR-FE)

    Click here

  8. DISCONNECT WATER BY-PASS HOSE


    1. A01T96O

      Slide the 2 clips and disconnect the 2 water by-pass hoses from the transmission oil cooler.

  9. REMOVE TRANSMISSION OIL COOLER


    1. A01TCNI

      Remove the 3 bolts and transmission oil cooler from the continuously variable transaxle assembly.

    2. Remove the 2 O-rings from the transmission oil cooler.