BACK-UP LIGHT SWITCH INSTALLATION

PROCEDURE


  1. INSTALL BACK-UP LIGHT SWITCH ASSEMBLY


    1. B004424N02

      Using SST, install a new gasket and the back-up light switch assembly to the manual transaxle assembly.

      SST
      09817-16011
      Torque:
      40.2 N*m  { 410 kgf*cm, 30 ft.*lbf }
    2. Connect the back-up light switch assembly connector.

  2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1ZR-FAE)

    Click here

  3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1ZR-FE)

    Click here

  4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1ZR-FAE)

    Click here

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1ZR-FE)

    Click here

  6. INSTALL NO. 2 CYLINDER HEAD COVER (for 1ZR-FAE)

    Click here

  7. INSTALL NO. 2 CYLINDER HEAD COVER (for 1ZR-FE)

    Click here