INPUT SHAFT INSPECTION

PROCEDURE


  1. INSPECT INPUT SHAFT


    1. A00YAL9

      Check the input shaft for wear and damage.

    2. Using a dial indicator, measure the input shaft runout.

      Maximum Runout
      0.03 mm (0.00118 in.)

      If the runout exceeds the maximum, replace the input shaft.

    3. A00Y6A9N01

      Using a micrometer, measure the outer diameter of the input shaft journal surface.

      Standard
      Measured Part Outer Diameter mm (in.)
      A 30.008 to 30.020 (1.1814 to 1.1819)
      B 32.002 to 32.018 (1.2599 to 1.2605)

      If the outer diameter is below the minimum, replace the input shaft.