NETWORK GATEWAY ECU INSTALLATION

PROCEDURE


  1. INSTALL CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)


    1. Engage the guide.

    2. Install the central gateway ECU (network gateway ECU) with the bolt.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    3. Connect the connector.

  2. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

    Click here

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here