GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the wire harness clamp bracket with the bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. B00429B

      Temporarily install the generator assembly with the bolt.

    3. B0041RY

      Temporarily install the adjusting bar with the 2 bolts.

    4. B0044AT

      Connect the generator assembly connector and engage the wire harness clamp.

    5. Connect the wire harness to terminal B and install the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    6. Install the terminal cap.

    7. B0043I0

      Tighten the bolt.

      Torque:
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
  2. INSTALL V-RIBBED BELT

    Click here

  3. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here