PROCEDURE
INSTALL CYLINDER HEAD GASKET
| *a | Lot No. |
|
Front of Engine |
Place a new cylinder head gasket on the cylinder block sub-assembly with the Lot No. stamp facing upward.
Note
Remove any oil from the contact surfaces.
Pay attention to the installation direction.
| *1 | Cylinder Head Gasket |
| *a | 4 to 7 mm (0.157 to 0.276 in.) |
| *b | 7 to 10 mm (0.276 to 0.394 in.) |
| *c | 6.5 to 8 mm (0.256 to 0.315 in.) |
|
Front of Engine |
Apply seal packing to the cylinder head gasket as shown in the illustration.
| Seal Packing |
|---|
| Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent |
Note
Remove any oil from the contact surfaces.
Install the cylinder head gasket within 3 minutes and tighten the cylinder head set bolts within 15 minutes of applying seal packing.
INSTALL CYLINDER HEAD SUB-ASSEMBLY
INSTALL VALVE STEM CAP
INSTALL VALVE LASH ADJUSTER ASSEMBLY
INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY
INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY