CYLINDER HEAD GASKET(w/o Glow Plug Controller) INSTALLATION

PROCEDURE


  1. INSTALL CYLINDER HEAD GASKET


    1. A01LZISC01
      *a Front
      *b Protrusion
      *c X: Measurement Points

      Inspect the protrusion height of the piston heads.


      1. Place a dial indicator on the cylinder block sub-assembly as shown in the illustration.

        Note

        Make sure that the dial indicator is at a right angle to the cylinder block sub-assembly top surface.

      2. Measure the protrusion height of the piston head of each cylinder at 2 points as shown in the illustration.

    2. A01M0UMN02

      Select a new cylinder head gasket.


      1. Select the highest protrusion height among the 8 measurements recorded. It will be used to select a new cylinder head gasket.

        Piston Protrusion

        Piston Protrusion

        mm (in.)

        Number of Gasket Cutout Gasket Size

        0.525 to 0.575

        (0.02067 to 0.02264)

        1 A

        0.576 to 0.625

        (0.02268 to 0.02461)

        2 B

        0.626 to 0.675

        (0.02465 to 0.02657)

        3 C

        0.676 to 0.725

        (0.02661 to 0.02854)

        4 D

        0.726 to 0.775

        (0.02858 to 0.03051)

        5 E
    3. Install the cylinder head gasket.


      1. Apply seal packing (diameter 3.5 to 4.5 mm (0.138 to 0.177 in.)) to the cylinder block sub-assembly as shown in the illustration.

        A01M1MWC01
        *1 Cylinder Head Gasket - -
        *a Cylinder Head Side *b Cylinder Block Side
        Seal packing
        Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

        Note

        Remove any oil from the contact surfaces.

      2. Place a new cylinder head gasket on the cylinder block sub-assembly with the Lot No. stamp facing upward.

      3. Apply seal packing (Diameter 3.5 to 4.5 mm (0.138 to 0.177 in.)) to the top surface of the cylinder head sub-assembly as shown in the illustration.

        Seal packing
        Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

        Note


        • Remove any oil from the contact surfaces.

        • Install the cylinder head sub-assembly within 3 minutes, and tighten the bolts within 15 minutes of applying the seal packing.

        • Do not start the engine for at least 2 hours after installing the cylinder head gasket.

  2. INSTALL CYLINDER HEAD SUB-ASSEMBLY

    Click here

  3. CONNECT INLET WATER HOSE RH


    1. A01LYAJC01
      *a Upper
      *b Rear
      *c View A

      Connect the inlet water hose RH to the outlet water sub-assembly.

  4. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY

    Click here

  5. INSTALL CAMSHAFT

    Click here

  6. INSTALL CHAIN SUB-ASSEMBLY

    Click here

  7. INSTALL NO. 1 CHAIN VIBRATION DAMPER

    Click here

  8. INSTALL CHAIN TENSIONER SLIPPER

    Click here

  9. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY

    Click here

  10. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY

    Click here

  11. CONNECT INLET WATER HOSE LH

    Click here

  12. INSTALL CRANKSHAFT DAMPER SUB-ASSEMBLY

    Click here

  13. INSTALL NO. 2 TIMING CHAIN COVER

    Click here

  14. INSTALL ENGINE MOUNTING BRACKET RH

    Click here

  15. CHECK VALVE CLEARANCE

    Click here

  16. ADJUST VALVE CLEARANCE

    Click here

  17. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

    Click here

  18. INSTALL HARNESS BRACKET

    Click here

  19. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

    Click here

  20. INSTALL VACUUM PUMP ASSEMBLY

    Click here

  21. INSTALL CAMSHAFT POSITION SENSOR (w/o Stop And Start System)

    Click here

  22. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY

    Click here

  23. INSTALL NO. 4 WATER BY-PASS HOSE

    Click here

  24. INSTALL NO. 2 OIL COOLER HOSE

    Click here

  25. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here

  26. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR

    Click here

  27. INSTALL COMMON RAIL ASSEMBLY

    Click here

  28. INSTALL NO. 1 SUPPLY PUMP DRIVE COUPLING

    Click here

  29. TEMPORARILY INSTALL SUPPLY PUMP ASSEMBLY

    Click here

  30. INSTALL FUEL INLET PIPE SUB-ASSEMBLY

    Click here

  31. INSTALL NO. 2 FUEL HOSE

    Click here

  32. INSTALL INJECTION NOZZLE SEAT

    Click here

  33. INSTALL INJECTOR ASSEMBLY

    Click here

  34. INSTALL NOZZLE HOLDER CLAMP SEAT

    Click here

  35. INSTALL NO. 1 NOZZLE HOLDER CLAMP

    Click here

  36. INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY

    Click here

  37. INSTALL NOZZLE LEAKAGE PIPE SET CLAMP

    Click here

  38. INSTALL NO. 2 INTAKE MANIFOLD INSULATOR

    Click here

  39. INSTALL GLOW PLUG ASSEMBLY

    Click here

  40. INSTALL NO. 1 GLOW PLUG CONNECTOR

    Click here

  41. INSTALL NO. 1 INJECTION PIPE SUB-ASSEMBLY

    Click here

  42. INSTALL NO. 2 INJECTION PIPE SUB-ASSEMBLY

    Click here

  43. INSTALL NO. 3 INJECTION PIPE SUB-ASSEMBLY

    Click here

  44. INSTALL INTAKE AIR CONNECTOR WITH DIESEL THROTTLE BODY

    Click here

  45. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

    Click here

  46. INSTALL ENGINE OIL LEVEL DIPSTICK

    Click here

  47. INSTALL EGR VALVE (ELECTRIC EGR CONTROL VALVE ASSEMBLY)

    Click here

  48. INSTALL HARNESS BRACKET

    Click here

  49. INSTALL NO. 1 EGR COOLER BRACKET

    Click here

  50. INSTALL EGR WITH COOLER PIPE ASSEMBLY

    Click here

  51. INSTALL GENERATOR BRACKET

    Click here

  52. INSTALL GENERATOR ASSEMBLY

    Click here

  53. INSTALL ENGINE COVER BRACKET (w/ No. 1 Engine Cover)

    Click here

  54. REMOVE ENGINE STAND

    Click here