ECM INSTALLATION

PROCEDURE


  1. INSTALL ECM


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    3. Engage the guide and install the ECM with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

    4. Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.

      • Be sure to securely connect the ECM connectors.

  2. INSTALL NO. 1 AIR CLEANER INLET


    1. Install the No. 1 air cleaner inlet with the bolt.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  5. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE

    Click here

  6. INSTALL NO. 1 ENGINE COVER

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  8. PERFORM REGISTRATION

    Click here

  9. PERFORM INITIALIZATION

    Click here