SFI SYSTEM Starter Signal Circuit

DESCRIPTION

While the engine is being cranked, current flows from terminal ST2 of the ignition or starter switch assembly*1 or terminal STAR of the certification ECU (smart key ECU assembly)*2 to the park/neutral position switch assembly*3 or clutch start switch assembly*4 and to terminal STA of the ECM (STA signal).

*1: w/o entry and start system

*2: w/ entry and start system

*3: for CVT models

*4: for manual transaxle models

WIRING DIAGRAM

Refer to DTC P0617.

Click here

CAUTION / NOTICE / HINT

Note

Inspect the fuses for circuits related to this system before performing the following procedure.

PROCEDURE


  1. CHECK WHETHER ENGINE CAN BE CRANKED


    1. Check if the engine can be cranked.

      Result
      Result Proceed to
      Engine cannot be cranked A
      Engine can be cranked B

    B
    A
  2. READ VALUE USING GTS (STARTER SIGNAL)


    1. Connect the GTS to the DLC3.

    2. Turn the ignition switch to ON.

    3. Turn the GTS on.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Starter Signal.


      Powertrain > Engine and ECT > Data List
      Tester Display
      Starter Signal
    5. Check the value displayed on the GTS when the ignition switch is turned to the ON and START positions.

      OK
      Switch Position Starter Signal
      ON OFF
      START ON
      Result
      Result Proceed to
      NG (for CVT models) A
      NG (for manual transaxle models) B
      OK C

    B
    C
    A
  3. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    1. Inspect the park/neutral position switch assembly.

      Click here

      Result
      Result Proceed to
      OK (w/ entry and start system) A
      OK (w/o entry and start system) B
      NG C

    B
    C
    A
  4. CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM)


    1. Disconnect the certification ECU (smart key ECU assembly) connector.

    2. Disconnect the park/neutral position switch assembly connector.

    3. Disconnect the ECM connector.

    4. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      E33-5 (STAR) - B110-4 (B) Always Below 1 Ω
      E33-5 (STAR) - B31-63 (NSW) Always Below 1 Ω
      E33-5 (STAR), B110-4 (B) or B31-63 (NSW) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  5. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ST NO. 1 RELAY - ECM - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))


    1. Disconnect the park/neutral position switch assembly connector.

    2. Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    3. Disconnect the ECM connector.

    4. Disconnect the certification ECU (smart key ECU assembly) connector.

    5. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      B110-9 (L) - A50-22 (STA) Always Below 1 Ω
      B110-9 (L), 2 (ST NO. 1 relay), A50-22 (STA) or E33-7 (STA) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    OK
    NG
  6. INSPECT IGNITION OR STARTER SWITCH ASSEMBLY


    1. Inspect the ignition or starter switch assembly.

      Click here

      Result
      Proceed to
      OK
      NG

    NG
    OK
  7. CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM)


    1. Disconnect the ignition or starter switch assembly connector.

    2. Disconnect the park/neutral position switch assembly connector.

    3. Disconnect the ECM connector.

    4. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      E4-2 (ST2) - B110-4 (B) Always Below 1 Ω
      E4-2 (ST2) - B31-63 (NSW) Always Below 1 Ω
      E4-2 (ST2), B110-4 (B) or B31-63 (NSW) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  8. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ST NO. 1 RELAY - ECM)


    1. Disconnect the park/neutral position switch assembly connector.

    2. Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    3. Disconnect the ECM connector.

    4. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      B110-9 (L) - A50-22 (STA) Always Below 1 Ω
      B110-9 (L), 2 (ST NO. 1 relay) or A50-22 (STA) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    OK
    NG
  9. INSPECT CLUTCH START SWITCH ASSEMBLY


    1. Inspect the clutch start switch assembly.

      Click here

      Result
      Result Proceed to
      OK (w/ entry and start system) A
      OK (w/o entry and start system) B
      NG C

    B
    C
    A
  10. CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - CLUTCH START SWITCH ASSEMBLY)


    1. Disconnect the certification ECU (smart key ECU assembly) connector.

    2. Disconnect the clutch start switch assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      E33-5 (STAR) - A5-2 Always Below 1 Ω
      E33-5 (STAR) or A5-2 - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  11. CHECK HARNESS AND CONNECTOR (CLUTCH START SWITCH ASSEMBLY - ST NO. 1 RELAY - ECM - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))


    1. Disconnect the clutch start switch assembly connector.

    2. Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    3. Disconnect the ECM connector.

    4. Disconnect the certification ECU (smart key ECU assembly) connector.

    5. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A5-1 - A50-22 (STA) Always Below 1 Ω
      A5-1, 2 (ST NO. 1 relay), A50-22 (STA) or E33-7 (STA) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    OK
    NG
  12. INSPECT IGNITION OR STARTER SWITCH ASSEMBLY


    1. Inspect the ignition or starter switch assembly.

      Click here

      Result
      Proceed to
      OK
      NG

    NG
    OK
  13. CHECK HARNESS AND CONNECTOR (IGNITION OR STARTER SWITCH ASSEMBLY - CLUTCH START SWITCH ASSEMBLY)


    1. Disconnect the ignition or starter switch assembly connector.

    2. Disconnect the clutch start switch assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      E4-2 (ST2) - A5-2 Always Below 1 Ω
      E4-2 (ST2) or A5-2 - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  14. CHECK HARNESS AND CONNECTOR (CLUTCH START SWITCH ASSEMBLY - ST NO. 1 RELAY - ECM)


    1. Disconnect the clutch start switch assembly connector.

    2. Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    3. Disconnect the ECM connector.

    4. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A5-1 - A50-22 (STA) Always Below 1 Ω
      A5-1, 2 (ST NO. 1 relay) or A50-22 (STA) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    OK
    NG
  15. INSPECT ST NO. 1 RELAY


    1. Inspect the ST NO. 1 relay.

      Click here

      Result
      Proceed to
      OK
      NG

    NG
    OK
  16. INSPECT STARTER ASSEMBLY


    1. Inspect the starter assembly.

      Click here

      Result
      Proceed to
      OK
      NG

    NG
    OK
  17. CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - STARTER ASSEMBLY)


    1. Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    2. Disconnect the starter assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      3 (ST NO. 1 relay) - B8-1 Always Below 1 Ω
      3 (ST NO. 1 relay) or B8-1 - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  18. CHECK TERMINAL VOLTAGE (POWER SOURCE OF STARTER ASSEMBLY)


    1. Disconnect the starter assembly connector.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      B4-1 - Body ground Always 11 to 14 V
      Result
      Proceed to
      OK
      NG

    NG
    OK
  19. CHECK TERMINAL VOLTAGE (POWER SOURCE OF ST NO. 1 RELAY)


    1. A012KUTC04
      *1 Engine Room Relay Block and Junction Block Assembly
      *2 ST NO. 1 Relay

      Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      5 (ST NO. 1 relay) - Body ground Always 11 to 14 V
      Result
      Proceed to
      OK
      NG

    NG
    OK
  20. CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - BODY GROUND)


    1. Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 (ST NO. 1 relay) - Body ground Always Below 1 Ω
      Result
      Result Proceed to
      OK (for CVT models) A
      OK (for manual transaxle models) B
      NG C

    B
    C
    A
  21. CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY)


    1. Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    2. Disconnect the park/neutral position switch assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      2 (ST NO. 1 relay) - B110-9 (L) Always Below 1 Ω
      Result
      Proceed to
      OK
      NG

    OK
    NG
  22. CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - CLUTCH START SWITCH ASSEMBLY)


    1. Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.

    2. Disconnect the clutch start switch assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      2 (ST NO. 1 relay) - A5-1 Always Below 1 Ω
      Result
      Proceed to
      OK
      NG

    OK
    NG
  23. READ VALUE USING GTS (STARTER SIGNAL)


    1. Connect the GTS to the DLC3.

    2. Turn the ignition switch to ON.

    3. Turn the GTS on.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Starter Signal.


      Powertrain > Engine and ECT > Data List
      Tester Display
      Starter Signal
    5. Check the value displayed on the GTS when the ignition switch is turned to the ON and START positions.

      OK
      Switch Position Starter Signal
      ON OFF
      START ON
      Result
      Proceed to
      OK
      NG

    OK
    NG