STARTER(w/ Stop And Start System) INSTALLATION

PROCEDURE


  1. INSTALL STARTER ASSEMBLY


    1. A012MJV

      Install the starter assembly with the 2 bolts.

      Torque:
      37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    2. A012IA4

      Connect terminal 30 with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Connect the starter assembly connector.

    4. Close the terminal cap.

  2. INSTALL NO. 1 AIR TUBE

    Click here

  3. INSTALL NO. 2 AIR TUBE

    Click here

  4. INSTALL NO. 3 AIR HOSE

    Click here

  5. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  6. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  7. INSTALL BATTERY

    Click here

  8. INSTALL NO. 1 ENGINE UNDER COVER

  9. INSTALL NO. 1 ENGINE COVER (w/ No. 1 Engine Cover)

    Click here

  10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL