PROCEDURE
INSTALL DIESEL THROTTLE BODY ASSEMBLY
| *a | Bolt Length: 50 mm (1.97 in.) |
| *b | Bolt Length: 25 mm (0.984 in.) |
| *c | Bolt Length |
Install a new venturi gasket and the diesel throttle body assembly to the intake air connector with the 4 bolts as shown in the illustration.
Note
If the diesel throttle body assembly has been struck or dropped, replace it.
| *1 | No. 3 Water By-pass Hose |
| *2 | No. 5 Water By-pass Hose |
| *a | Paint Mark |
| *b | Up |
| *c | LH Side |
| *d | Claws of clip should not enter this area |
Connect the No. 3 water by-pass hose and No. 5 water by-pass hose to the diesel throttle body assembly in the positions shown in the illustration, and slide the 2 clips to secure them.
Engage the clamp to install the engine wire.
Install the bolt.
Connect the generator assembly connector and diesel throttle body assembly connector.
INSTALL NO. 2 AIR TUBE
| *a | Stopper |
| *b | Paint Mark |
| *c | Rear of Vehicle |
| *d | Front of Vehicle |
| *e | LH Side |
| *f | 30° |
| *g | 90° |
| *h | 150° |
Install the No. 2 air tube and tighten the 2 hose clamps in the positions shown in the illustration.
Tech Tips
Align the stopper on the No. 2 air tube with paint mark on the No. 3 air hose.
Install the 2 bolts.
Connect the intake air temperature sensor connector.
INSTALL INTERCOOLER AIR HOSE
INSTALL NO. 1 ENGINE COVER (w/ No. 1 Engine Cover)
INSTALL NO. 1 ENGINE UNDER COVER
for Full Cover Type:
for Half Cover Type:
PERFORM INITIALIZATION