STARTER INSTALLATION

PROCEDURE


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts.

      Torque:
      64 N*m  { 653 kgf*cm, 47 ft.*lbf }
    2. A012I4Z

      Connect terminal 30 with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Connect the connector.

    4. Close the terminal cap.

  2. INSTALL NO. 3 AIR HOSE

    Click here

  3. INSTALL NO. 1 ENGINE UNDER COVER

  4. INSTALL BATTERY CARRIER

    Click here

  5. INSTALL BATTERY

    Click here

  6. INSTALL NO. 1 ENGINE COVER

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here