NETWORK GATEWAY ECU(for LHD) INSTALLATION

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. Install the network gateway ECU with the bolt.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    2. Connect the connector.

  2. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY

    Click here

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. PERFORM DIAGNOSTIC SYSTEM CHECK

    Click here

  5. CHECK SRS WARNING LIGHT

    Click here