TRANSMISSION CONTROL CABLE INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. A002QIO

      Attach the grommet of the control cable assembly with the 2 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. A002ORS

      Attach the bracket of the control cable assembly with the bolt.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    3. A002M8B

      Connect the 2 cables to the control cable bracket with 2 new clips.

    4. A002MSS

      Connect the 2 cables to the transaxle and install the 2 clips.

    5. A002N99

      Engage the 2 claws, and install the control cable assembly to the shift lever assembly.

      Note

      Make sure that the claws are firmly engaged.

    6. A002PO8E03
      Text in Illustration
      *1 Select Cable

      Install the control shift cable to the shift lever assembly.

    7. A002PC9E02
      *1 Stopper
      *2 Turn

      Release the lock of the cable length adjustment structure of the select cable.


      1. Turn the stopper.

      2. A002N6CE05
        *1 Lock Piece
        *2 Pull out
        *3 Case

        Pull the lock piece outward from the case to release the lock.

      3. A002LQ3E04
        *1 Stopper
        *2 Return

        Return the stopper.

    8. A002MABE03
      Text in Illustration
      *1 Reverse Restrict Pin Assembly
      *2 Outer Lever

      Hook the outer lever of the manual transaxle onto the reverse restrict pin assembly to secure it.

    9. A002PHHE02

      Connect the control select cable to the shift lever assembly.

    10. Push the slider against the inhibitor wall.

      Note


      • Do not pull up the slider.

      • When adjusting the cable, make sure that the shift lever is not in the 1 or 2.

    11. Lock the cable length adjustment structure of the select cable.


      1. Turn the stopper.*1

      2. Push the lock piece into the case.*2

      3. Return the stopper to prevent the lock from being released.*3

        Note


        • Push the lock piece as far as it will go.

        • Confirm whether the cable length adjustment structure is locked securely.

    12. A002P7ME03
      *1 Reverse Restrict Pin Assembly
      *2 Outer Lever
      *3 Release

      Move the shift lever to R to release the outer lever.

  2. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

    A002QD0

    1. Install the front No. 1 floor heat insulator with the 3 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
  3. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

    Click here

  4. INSTALL AIR CLEANER CASE

    Click here

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  6. INSTALL BATTERY CARRIER

    Click here

  7. INSTALL BATTERY TRAY

  8. INSTALL BATTERY

  9. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    Click here

  10. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here

  11. CONNECT CABLE TO POSITIVE BATTERY TERMINAL

  12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  13. INSTALL FRONT EXHAUST PIPE ASSEMBLY


    1. Install the front exhaust pipe assembly Click here.