DOOR CONTROL BATTERY(for RHD) INSTALLATION

PROCEDURE


  1. INSTALL DOOR CONTROL BATTERY


    1. B0019JV

      Connect the connector.

      Text in Illustration
      B0018FC Nut
      B00199O Connector
    2. Attach the door control battery with the nut.

  2. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY

    Click here

  3. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

    Click here

  4. INSTALL INNER NO. 1 INSTRUMENT PANEL BRACKET COVER RH

    Click here

  5. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  6. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH

    Click here

  7. INSTALL NO. 1 SWITCH HOLE BASE

    Click here

  8. INSTALL INSTRUMENT SIDE PANEL RH

    Click here

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  10. REMOVE UPPER RADIATOR SUPPORT SEAL

    Click here

  11. CHECK SRS WARNING LIGHT


    1. Check the SRS warning light Click here