DOOR CONTROL RECEIVER INSTALLATION

PROCEDURE


  1. INSTALL DOOR CONTROL RECEIVER


    1. A01WSG5

      Install the receiver with the bolt.

      Torque:
      15 N*m  { 153 kgf*cm, 11 ft.*lbf }
    2. Connect the connector.

  2. INSTALL REAR UPPER PILLAR GARNISH RH

    Click here

  3. CONNECT POWER BACK DOOR ROD (w/ Power Back Door)

    Click here

  4. INSTALL BACK DOOR SIDE GARNISH RH (w/ Power Back Door)

    Click here

  5. INSTALL CENTER BACK DOOR GARNISH (w/ Power Back Door)

    Click here

  6. INSTALL FRONT QUARTER TRIM PANEL ASSEMBLY RH

    Click here

  7. INSTALL REAR FLOOR MAT REAR SUPPORT PLATE

    Click here

  8. INSTALL REAR DOOR SCUFF PLATE RH

    Click here

  9. INSTALL REAR STEP COVER

    Click here

  10. INSTALL REAR NO. 2 SEAT ASSEMBLY RH


    1. Install the rear No. 2 seat assembly RH Click here.