CAUTION / NOTICE / HINT
Tech Tips
A bolt without a torque specification is shown in the standard bolt chart Click here.
PROCEDURE
INSTALL NETWORK GATEWAY ECU
Install the network gateway ECU with the nut.
Connect the connector.
INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY
INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL
INSTALL INNER NO. 1 INSTRUMENT PANEL BRACKET COVER RH
INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH
INSTALL NO. 1 SWITCH HOLE BASE
INSTALL INSTRUMENT SIDE PANEL RH
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL UPPER RADIATOR SUPPORT SEAL
CHECK SRS WARNING LIGHT