POWER STEERING ECU(for RHD) INSTALLATION

PROCEDURE


  1. INSTALL POWER STEERING ECU ASSEMBLY


    1. Install the bolt and power steering ECU assembly to the junction block.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the connectors and attach the wire harness clamp.

      B0019HME03
    3. Install the junction block with the 2 nuts and bolt.

      Torque:
      Nut A and Bolt
      7.6 N*m  { 77 kgf*cm, 67 in.*lbf }
      Nut B
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  2. INSTALL INSTRUMENT PANEL BOX ASSEMBLY

    Click here

  3. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  5. CHECK SRS WARNING LIGHT

    Click here