PROCEDURE
INSTALL VANE PUMP ASSEMBLY
Coat a new O-ring with MP grease and install it to the vane pump.
Install the vane pump with the 2 nuts.
CONNECT PRESSURE FEED TUBE ASSEMBLY
Install a new gasket to the pressure feed tube.
Install the pressure feed tube and union with the union bolt.
Tech Tips
Make sure that the stopper of the tube touches the vane pump body before tightening the bolt.
Connect the 2 connectors.
CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE
Connect the pump hose to the vane pump with the clip.
INSTALL V-RIBBED BELT
INSTALL NO. 3 IDLER PULLEY (w/ Viscous Heater)
INSTALL NO. 1 IDLER PULLEY (w/ Viscous Heater)
INSTALL V-RIBBED BELT (w/ Viscous Heater)
INSTALL RADIATOR RESERVE TANK ASSEMBLY
INSTALL INTAKE AIR CONNECTOR
TEMPORARILY INSTALL NO. 1 AIR CLEANER HOSE
INSTALL AIR CLEANER CAP SUB-ASSEMBLY
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
INSTALL UPPER RADIATOR SUPPORT SEAL
INSTALL FRONT FENDER APRON TRIM PACKING A
ADD POWER STEERING FLUID
BLEED POWER STEERING FLUID
INSPECT FOR POWER STEERING FLUID LEAK
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.