TCM(for RHD) INSTALLATION

PROCEDURE


  1. INSTALL TCM


    1. Install the TCM to the instrument panel junction block assembly with the 2 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }

      Note

      If the TCM has been struck or dropped, replace it.

  2. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL

    Click here