OIL PUMP INSTALLATION

CAUTION / NOTICE / HINT

Note


  • When replacing an injector (including interchanging injectors between cylinders) or common rail, replace the corresponding injection pipes with new ones.

  • w/ DPF

    When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines Click here.

PROCEDURE


  1. INSTALL OIL PUMP ASSEMBLY


    1. Install the oil pump assembly with the 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  2. INSTALL REAR CRANKSHAFT OIL SEAL

    Click here

  3. INSTALL REAR ENGINE OIL SEAL RETAINER

    Note

    When the contact surfaces shown below are wet, wipe them with an oil-free cloth before applying seal packing.

    B0019GPE02

    1. B0019ZGE04
      Text in Illustration
      *a Cylinder Block *b Rear Engine Oil Seal Retainer

      Apply seal packing in a continuous line as shown in the illustration.

      Standard seal diameter
      3.0 to 5.0 mm (0.118 to 0.197 in.)
      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Note


      • Remove any oil from the contact surface.

      • Install the rear engine oil seal retainer within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.

    2. Apply engine oil to the oil seal lip.

    3. Make sure that the lip of the oil seal is properly installed.

    4. B001ACJE03
      Text in Illustration
      *a Seal Diameter: 3.0 to 5.0 mm (0.118 to 0.197 in.)
      *b 2.5 mm (0.0984 in.)
      *c 2.0 mm (0.0787 in.)

      Install and uniformly tighten the 10 bolts in the order shown in the illustration.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note


      • When installing the oil seal retainer, make sure the lip of the oil seal is not damaged.

      • When installing the oil seal retainer, make sure the lip of the oil seal is not folded incorrectly.

  4. INSTALL OIL REGULATOR ASSEMBLY


    1. Install the oil regulator assembly with the 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  5. INSTALL NO. 1 OIL PAN SUB-ASSEMBLY

    Note

    When the contact surfaces shown below are wet, wipe them with an oil-free cloth before applying seal packing.

    B0018A6E02
    Text in Illustration
    *a Cylinder Block *b No. 1 Oil Pan Sub-assembly

    1. Install the cylinder block oil hole gasket.

    2. Apply a light coat of engine oil to 3 new O-rings and set the 3 O-rings to the oil regulator and scavenging pump.

    3. B001ABHE04
      Text in Illustration
      *a 8.5 mm (0.335 in.)
      *b Seal Diameter: 3.5 to 4.0 mm (0.138 to 0.157 in.)

      Apply seal packing to the No. 1 oil pan sub-assembly as shown in the illustration.

      Standard seal diameter
      3.5 to 4.0 mm (0.134 to 0.157 in.)
      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Note


      • For the 3 bolt holes labeled with arrows, apply the seal packing on the outer edges. For the other bolt holes, apply the seal packing on the inner edges.

      • Make sure to apply a continuous bead of seal packing as shown in the illustration. If the bead breaks, overlap 3 mm (0.118 in.) of seal packing and continue the bead.

      • Remove any oil and old seal packing from the contact surface.

      • Install the No. 1 oil pan sub-assembly within 3 minutes and tighten the bolts and nuts within 15 minutes after applying seal packing.

      • Do not start the engine for at least 2 hours after installation.

    4. B001B4VE03
      Text in Illustration
      *a Nut
      *b Oil Reflector Plate

      Install the No. 1 oil pan sub-assembly and oil reflector plate with the 20 bolts and 2 nuts.

      Torque:
      25 N*m  { 250 kgf*cm, 18 ft.*lbf }
      Bolt Length
      Item Quantity Length
      Bolt A 7 70 mm (2.76 in.)
      Bolt B 8 20 mm (0.787 in.)
      Bolt C 5 30 mm (1.18 in.)
  6. INSTALL OIL STRAINER SUB-ASSEMBLY


    1. Apply a light coat of engine oil to a new O-ring, and install it to the oil strainer.

    2. Install the oil strainer sub-assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  7. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY

    Note

    When the contact surfaces shown below are wet, wipe them with an oil-free cloth before applying seal packing.

    B0019DPE02
    Text in Illustration
    *a No. 1 Oil Pan Sub-assembly *b No. 2 Oil Pan Sub-assembly

    1. B0018S7E02
      Text in Illustration
      *a 9.0 mm (0.354 in.)
      *b Seal Diameter: 5.0 to 6.0 mm (0.197 to 0.236 in.)

      Apply seal packing to the No. 2 oil pan sub-assembly as shown in the illustration.

      Standard seal diameter
      5.0 to 6.0 mm (0.197 to 0.236 in.)
      Seal packing
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Note


      • For the bolt and pin holes, make sure to apply seal packing to the inner sides.

      • Make sure to apply a continuous bead of seal packing as shown in the illustration. If the bead breaks, overlap 3.0 mm (0.118 in.) of seal packing and continue the bead.

      • Remove any oil from the contact surface.

      • Install the No. 2 oil pan sub-assembly within 3 minutes and tighten the bolts and nuts within 10 minutes after applying seal packing.

      • Do not start the engine for at least 2 hours after installation.

    2. Install the No. 2 oil pan sub-assembly with the 10 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  8. INSTALL ENGINE OIL LEVEL SENSOR


    1. Install a new gasket and the sensor with the 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  9. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY


    1. B001846E01
      Text in Illustration
      *a New O-Ring

      Apply a light coat of engine oil to 2 new O-rings, and set them to the oil filter bracket sub-assembly.

    2. Install the oil filter bracket with the 3 bolts and 2 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    3. Connect the 2 wire harness clamps.

  10. INSTALL OIL FILTER ELEMENT

    Click here

  11. INSTALL TIMING GEAR COVER SPACER


    1. Install the timing gear cover spacer with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  12. INSTALL CRANKSHAFT PULLEY

    Click here

  13. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


    1. B001ADEE03

      Install the V-ribbed belt tensioner assembly with the 5 bolts.

      Torque:
      for bolt A and C
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
      for bolt B
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      Bolt Length
      Item Quantity Length
      Bolt A 1 116 mm (4.57 in.)
      Bolt B 2 40 mm (1.58 in.)
      Bolt C 2 95 mm (3.74 in.)
    2. Install the No. 1 idler pulley with the bolt.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    3. Install the V-ribbed belt tensioner bracket with the 3 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  14. CONNECT NO. 2 OIL COOLER HOSE


    1. Align the white paint marks on the No. 2 oil cooler hose and oil filter bracket and connect the hose.

      Note

      Make sure to maintain a space between the No. 2 oil cooler hose and crankshaft pulley and the No. 2 oil cooler hose and V-ribbed belt idler pulley.

  15. CONNECT NO. 1 OIL COOLER HOSE


    1. Face the pink paint mark on the No. 1 oil cooler hose toward the front side of the engine and connect the hose to the oil filter bracket.

      Note

      Make sure to maintain a space between the No. 1 oil cooler hose and crankshaft pulley.

  16. INSTALL STIFFENER INSULATOR RH


    1. Install the stiffener insulator RH with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  17. INSTALL NO. 2 INLET TURBO OIL PIPE SUB-ASSEMBLY


    1. Install a new gasket and connect the No. 2 inlet turbo oil pipe with the union bolt.

      Torque:
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }
  18. CONNECT NO. 2 OUTLET TURBO OIL HOSE

  19. INSTALL NO. 1 ENGINE OIL LEVEL DIPSTICK GUIDE


    1. Apply a light coat of engine oil to a new O-ring, and install it to the No. 1 engine oil level dipstick guide.

    2. Install the No. 1 engine oil level dipstick guide with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  20. CONNECT NO. 1 OUTLET TURBO OIL HOSE

  21. INSTALL GENERATOR ASSEMBLY


    1. for 150A Type:

      Click here

    2. for 180A Type:

      Click here

  22. INSTALL NO. 1 INTAKE AIR CONNECTOR PIPE

    Click here

  23. INSTALL ENGINE ASSEMBLY

    Click here

  24. CONNECT TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.


    1. Connect the cables to negative (-) main battery and sub-battery terminals.