INTAKE MANIFOLD INSTALLATION

CAUTION / NOTICE / HINT

Note


  • When replacing the injector assemblies (including shuffling the injector assemblies between the cylinders), common rail assembly, cylinder head sub-assembly, or intake manifold, it is necessary to replace the injection pipe sub-assemblies with new ones.

  • w/ DPF:

    When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines Click here.

PROCEDURE


  1. INSTALL RING PIN

    Note

    It is not necessary to remove a ring pin unless it is being replaced.


    1. for Intake Manifold and No. 2 Intake Manifold:


      1. B00183EE05
        Text in Illustration
        *a Protrusion Height

        Using a plastic-faced hammer, tap in the ring pins to the intake manifold and No. 2 intake manifold.

        Standard protrusion height
        4.4 to 5.6 mm (0.173 to 0.222 in.)
  2. INSTALL STUD BOLT

    Note

    If a stud bolt is deformed or its threads are damaged, replace it.


    1. for Intake Pipe Side:


      1. B001ARBE01
        Text in Illustration
        *a 42 mm (1.65 in.)
        *b 20 mm (0.787 in.)
        *c 13 mm (0.512 in.)

        Using an E8 "TORX" wrench, install the stud bolts to the intake pipe.

        Torque:
        6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
    2. for No. 3 Intake Manifold Side:


      1. Using an E8 "TORX" wrench, install the stud bolts labeled A to the No. 3 intake manifold.

        Torque:
        6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
      2. Using an E6 "TORX" wrench, install the stud bolts labeled B to the No. 3 intake manifold.

        Torque:
        5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
      3. Using an E6 "TORX" wrench, install the stud bolts labeled C to the No. 3 intake manifold.

        Torque:
        4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
      4. Using an E6 "TORX" wrench, install the stud bolt labeled D to the No. 3 intake manifold.

        Torque:
        4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
        B001ASGE02
        Text in Illustration
        *a 42 mm (1.65 in.) *b 20 mm (0.787 in.)
        *c 13 mm (0.512 in.) *d 24 mm (0.945 in.)
        *e 9.0 mm (0.354 in.) *f 39 mm (1.54 in.)
        *g 21 mm (0.827 in.) - -
  3. INSTALL NO. 2 INTAKE MANIFOLD


    1. Install a new gasket and the No. 2 intake manifold to the cylinder head sub-assembly LH with the 9 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  4. INSTALL INTAKE MANIFOLD


    1. Install a new gasket and the intake manifold to the cylinder head sub-assembly with the 9 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  5. INSTALL NO. 1 FUEL PIPE CLAMP (w/ DPF)


    1. Install the 2 No. 1 fuel pipe clamps to the cylinder head sub-assembly and cylinder head sub-assembly LH with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  6. INSTALL FUEL HOSE BRACKET (w/ DPF)


    1. Install the fuel hose bracket to the cylinder head sub-assembly LH with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  7. INSTALL NO. 1 WATER BY-PASS PIPE


    1. B0018QDE02
      Text in Illustration
      *A w/ DPF
      *B w/o DPF

      Temporarily install a new gasket and the No. 1 water by-pass pipe to the cylinder block sub-assembly with the union bolt and bolt.

    2. Tighten the union bolt and bolt in the order shown in the illustration.

      Torque:
      for union bolt
      59 N*m  { 600 kgf*cm, 43 ft.*lbf }
      for bolt
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  8. INSTALL FUEL TUBE SUB-ASSEMBLY (w/ DPF)


    1. Attach the 3 clamps to the 2 No. 1 fuel pipe clamps and fuel hose bracket.

    2. Connect the 3 fuel tube connectors to the supply pump assembly and 2 exhaust fuel addition injector assemblies Click here.

  9. INSTALL FUEL COOLER ASSEMBLY (w/o DPF)

    Click here

  10. INSTALL NO. 6 WATER BY-PASS HOSE (w/o DPF)


    1. Install the No. 6 water by-pass hose to the fuel cooler assembly and No. 1 water by-pass pipe, and slide the 2 clamps to secure the hose.

  11. INSTALL NO. 4 NOZZLE LEAKAGE PIPE (w/o DPF)


    1. B001AQIE02

      Temporarily install a new gasket and the No. 4 nozzle leakage pipe to the cylinder head sub-assembly LH and No. 2 intake manifold with the union bolt and bolt.

    2. Tighten the union bolt and bolt in the order shown in the illustration.

      Torque:
      for union bolt
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      for bolt
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the No. 2 fuel hose to the fuel cooler assembly, and slide the clamp to secure the hose.

  12. INSTALL NO. 3 NOZZLE LEAKAGE PIPE (w/o DPF)


    1. B0018I3E02

      Temporarily install a new gasket and the No. 3 nozzle leakage pipe to the cylinder head sub-assembly and intake manifold with the union bolt and bolt.

    2. Tighten the union bolt and bolt in the order shown in the illustration.

      Torque:
      for union bolt
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      for bolt
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the No. 1 fuel hose to the fuel cooler assembly, and slide the clamp to secure the hose.

  13. INSTALL EGR COOLER INSULATOR (w/ EGR System)


    1. Install the EGR cooler insulator to the starter assembly.

  14. INSTALL EGR VALVE ASSEMBLY WITH EGR COOLER ASSEMBLY (w/ EGR System)


    1. Connect the No. 5 water by-pass hose to the water by-pass outlet sub-assembly, and slide the clamp to secure the hose.

    2. B00190BE02

      Install 2 new gaskets and the EGR valve assembly with EGR cooler assembly to the intake manifold, No. 2 intake manifold, cylinder head sub-assembly and cylinder head sub-assembly LH with the 6 bolts labeled A and 4 bolts labeled B shown in the illustration.

      Torque:
      for bolt A
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      for bolt B
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }

      Tech Tips

      The gasket claws should face toward the No. 1 EGR pipe sub-assembly and No. 2 EGR pipe sub-assembly.

  15. INSTALL EGR PIPE INSULATOR (w/ EGR System)


    1. Install the EGR pipe insulator to the No. 2 EGR pipe sub-assembly and No. 1 EGR pipe sub-assembly with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }

      Note

      If the No. 1 EGR pipe sub-assembly and No. 2 EGR pipe sub-assembly insulator installation stay is deformed, or the bolt holes of the EGR pipe insulator do not align, replace the No. 1 EGR pipe sub-assembly and No. 2 EGR pipe sub-assembly as a set.

  16. INSTALL INTAKE MANIFOLD INSULATOR (w/ EGR System)


    1. Install the intake manifold insulator to the EGR cooler assembly.

  17. INSTALL NO. 3 INTAKE MANIFOLD


    1. Install 2 new gaskets to the intake manifold and No. 2 intake manifold.

    2. B00197Y

      Install the No. 3 intake manifold to the intake manifold and No. 2 intake manifold with the 16 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      Bolt Length
      Item Length
      Bolt A 25 mm (0.984 in.)
      Bolt B 70 mm (2.76 in.)
      Text in Illustration
      B0018FC for bolt A
      B00199O for bolt B
  18. CONNECT NO. 2 ENGINE WIRE


    1. B0019ISE02

      Connect the No. 2 engine wire with the 3 bolts.

      Torque:
      for bolt A
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
      for bolt B
      32 N*m  { 326 kgf*cm, 24 ft.*lbf }
    2. Attach the 2 wire harness clamps.

  19. INSTALL INTAKE PIPE


    1. w/ EGR System:


      1. Install 2 new gaskets and the intake pipe to the No. 3 intake manifold and No. 3 EGR pipe sub-assembly with the 6 bolts and 2 nuts.

        Torque:
        21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. w/o EGR System:


      1. Install a new gasket and the intake pipe to the No. 3 intake manifold with the 4 bolts and 2 nuts.

        Torque:
        21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  20. INSTALL NO. 2 INTAKE MANIFOLD INSULATOR


    1. Install the No. 2 intake manifold insulator to the No. 3 intake manifold.

  21. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR


    1. Install the No. 1 intake manifold insulator to the No. 3 intake manifold.

  22. INSTALL NO. 1 NOZZLE LEAKAGE PIPE (w/ DPF)

    Click here

  23. INSTALL NO. 2 NOZZLE LEAKAGE PIPE (w/ DPF)

    Click here

  24. INSTALL NO. 3 NOZZLE LEAKAGE PIPE (w/ DPF)


    1. Temporarily install 2 new gaskets and the No. 3 nozzle leakage pipe to the No. 2 nozzle leakage pipe, No. 1 nozzle leakage pipe, fuel hose bracket and intake pipe with the 2 injector hollow screws and 3 bolts.

    2. Tighten the 2 injector hollow screws and 3 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }

      Tech Tips

      Tighten the injector hollow screws first, and then tighten the bolts.

  25. INSTALL CONNECTING WIRE (w/ DPF)


    1. Attach the 2 clamps to install the connecting wire No. 3 nozzle leakage pipe.

  26. INSTALL COMMON RAIL ASSEMBLY RH

    Click here

  27. INSTALL INJECTION PIPE SUB-ASSEMBLY RH


    1. B0018TOE01
      Text in Illustration
      *a Torque Wrench Fulcrum Length

      Using a 17 mm union nut wrench, install 4 new injection pipe sub-assemblies to the common rail assembly RH and injector assembly RH.

      Torque:
      Specified tightening torque
      34 N*m  { 347 kgf*cm, 25 ft.*lbf }

      Tech Tips


      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench Click here.

      • When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29 N*m (297 kgf*cm, 21 ft.*lbf)

    2. Install the 4 injection pipe clamps with the 2 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
  28. INSTALL NO. 1 FUEL INJECTOR PROTECTOR (w/ DPF)

    Click here

  29. INSTALL NO. 2 FUEL INJECTOR PROTECTOR (w/ DPF)

    Click here

  30. INSTALL CYLINDER HEAD COVER SILENCER (w/ DPF)

    Click here

  31. INSTALL NO. 5 INJECTION PIPE SUB-ASSEMBLY


    1. Temporarily install a new No. 5 injection pipe sub-assembly to the common rail assembly RH and supply pump assembly by hand.

      Note

      Make sure there is no damage or foreign matter on the seal surfaces.

    2. w/ DPF:


      1. B0019GV

        Temporarily install the used gasket and fuel filter to injection pump fuel pipe sub-assembly to the cylinder head cover sub-assembly LH with the nut, bolt and union bolt.

    3. w/o DPF:


      1. B001AUH

        Temporarily install the used gasket and No. 2 fuel pipe sub-assembly to the No. 3 intake manifold and cylinder head cover sub-assembly with the nut, bolt and union bolt.

    4. B001AGLE04
      Text in Illustration
      *A w/ DPF
      *B w/o DPF

      Install the No. 2 injection pipe clamp with the bolt.

      Torque:
      4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
    5. B0018TOE01
      Text in Illustration
      *a Torque Wrench Fulcrum Length

      Using a 17 mm union nut wrench, tighten the No. 5 injection pipe sub-assembly ends.

      Torque:
      Specified tightening torque
      34 N*m  { 347 kgf*cm, 25 ft.*lbf }

      Tech Tips


      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench Click here.

      • When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29 N*m (297 kgf*cm, 21 ft.*lbf)

    6. Remove the bolt and No. 2 injection pipe clamp.

    7. Remove the union bolt and gasket.

    8. w/ DPF:


      1. Remove the bolt, nut, fuel filter to injection pump fuel pipe sub-assembly and gasket from the No. 3 intake manifold and cylinder head cover sub-assembly LH.

    9. w/o DPF:


      1. Remove the bolt, nut and No. 2 fuel pipe sub-assembly from the No. 3 intake manifold and cylinder head cover sub-assembly.

  32. CONNECT FUEL PUMP MOTOR WIRE


    1. Install the fuel pump motor wire to the No. 3 intake manifold with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the connector.

  33. INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE SUB-ASSEMBLY

    Note

    Check for damage and foreign matter on the fuel filter to injection pump fuel pipe sub-assembly installation surface of the supply pump assembly.

    If there is foreign matter, remove it from the installation surface.

    If the installation surface is damaged, replace the supply pump assembly.


    1. w/ DPF:


      1. Temporarily install a new gasket and fuel filter to injection pump fuel pipe sub-assembly to the No. 3 intake manifold and cylinder head cover sub-assembly LH with the nut, bolt and union bolt.

      2. Install the No. 2 injection pipe clamp with the bolt.

        Torque:
        4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
      3. Tighten the union bolt, bolt and nut.

        Torque:
        for union bolt
        12 N*m  { 125 kgf*cm, 9 ft.*lbf }
        for bolt and nut
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      4. Connect the fuel pump hose to the fuel filter to injection pump fuel pipe sub-assembly, and slide the clamp to secure the hose.

    2. w/o DPF:


      1. Install the fuel filter to injection pump fuel pipe sub-assembly to the cylinder head cover sub-assembly LH with the bolt.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      2. Connect the No. 3 fuel hose to the fuel filter to injection pump fuel pipe sub-assembly, and slide the clamp to secure the hose.

      3. Connect the fuel pump hose to the No. 1 fuel pipe, and slide the clamp to secure the hose.

  34. INSTALL COMMON RAIL ASSEMBLY LH

    Click here

  35. INSTALL NO. 5 NOZZLE LEAKAGE PIPE (w/ DPF)

    Click here

  36. INSTALL NO. 2 FUEL PIPE (w/ DPF)

    Click here

  37. INSTALL INJECTION PIPE SUB-ASSEMBLY LH


    1. B0018TOE01
      Text in Illustration
      *a Torque Wrench Fulcrum Length

      Using a 17 mm union nut wrench, install the 4 new injection pipe sub-assemblies to the common rail assembly LH and injector assembly LH.

      Torque:
      Specified tightening torque
      34 N*m  { 347 kgf*cm, 25 ft.*lbf }

      Tech Tips


      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench Click here.

      • When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29 N*m (297 kgf*cm, 21 ft.*lbf)

    2. Install the 4 injection pipe clamps with the 2 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
  38. INSTALL NO. 4 NOZZLE LEAKAGE PIPE (w/ DPF)


    1. Temporarily install a new gasket and No. 4 nozzle leakage pipe to the No. 2 nozzle leakage pipe with the check valve.

    2. Tighten the check valve.

      Torque:
      32 N*m  { 321 kgf*cm, 23 ft.*lbf }
    3. Connect the No. 5 fuel hose to the fuel filter to injection pump fuel pipe sub-assembly, and slide the clamp to secure the hose.

  39. INSTALL CYLINDER HEAD COVER SILENCER LH (w/ DPF)

    Click here

  40. INSTALL NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY (w/ DPF)

    Click here

  41. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (w/ DPF)

    Click here

  42. CONNECT NO. 6 INJECTION PIPE SUB-ASSEMBLY


    1. w/ EGR System:


      1. Temporarily install a new No. 6 injection pipe sub-assembly to the common rail assembly LH and common rail assembly RH.

        Note

        Make sure there is no damage or foreign matter on the seal surfaces.

      2. Install the 2 No. 2 injection pipe clamps with the 2 nuts.

        Torque:
        5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
      3. B0018TOE01
        Text in Illustration
        *a Torque Wrench Fulcrum Length

        Using a 17 mm union nut wrench, tighten the No. 6 injection pipe sub-assembly ends.

        Torque:
        Specified tightening torque
        34 N*m  { 347 kgf*cm, 25 ft.*lbf }

        Tech Tips


        • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench Click here.

        • When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29 N*m (297 kgf*cm, 21 ft.*lbf)

    2. w/o EGR System:


      1. Temporarily install a new No. 6 injection pipe sub-assembly to the common rail assembly LH, common rail assembly RH and No. 3 intake manifold.

        Note

        Make sure there is no damage or foreign matter on the seal surfaces.

      2. Install the No. 6 injection pipe sub-assembly bracket to the No. 3 intake manifold with the bolt.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      3. Install the No. 2 injection pipe clamp with the nut.

        Torque:
        5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
      4. B0018TOE01
        Text in Illustration
        *a Torque Wrench Fulcrum Length

        Using a 17 mm union nut wrench, tighten the No. 6 injection pipe sub-assembly ends.

        Torque:
        Specified tightening torque
        34 N*m  { 347 kgf*cm, 25 ft.*lbf }

        Tech Tips


        • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench Click here.

        • When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29 N*m (297 kgf*cm, 21 ft.*lbf)

  43. INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY (w/o DPF)

    Note

    Check for damage and foreign matter on the No. 2 fuel pipe sub-assembly installation surface of the supply pump assembly.

    If there is foreign matter, remove it from the installation surface. If the installation surface is damaged, replace the supply pump assembly.


    1. B001AF8E02

      Temporarily install a new gasket and the No. 2 fuel pipe sub-assembly to the No. 3 intake manifold and cylinder head cover sub-assembly with the union bolt, nut and bolt.

    2. Tighten the union bolt, nut and bolt in the order shown in the illustration.

      Torque:
      for union bolt
      12 N*m  { 125 kgf*cm, 9 ft.*lbf }
      for bolt and nut
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Install the No. 2 injection pipe clamp with the bolt.

      Torque:
      4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
    4. Connect the No. 1 fuel hose to the No. 5 nozzle leakage pipe, and slide the clamp to secure the hose.

  44. CONNECT ENGINE WIRE


    1. LH Side:


      1. Install the engine wire protector with the 2 bolts.

      2. Connect the 8 connectors.

      3. Attach the wire harness clamp.

      4. Install the engine wire harness bracket with the bolt.

      5. for RHD:

        Connect the wire harness with the wire harness clamp holder.

      6. Attach the 3 wire harness clamps and connect the 2 connectors.

      7. Attach the 3 wire harness clamps and connect the 4 connectors.

    2. RH Side:


      1. Install the engine wire harness protector with the 3 bolts.

      2. Connect the 7 connectors.

      3. Attach the wire harness clamp.

      4. Install the wire harness bracket with the bolt.

      5. Install the glow plug wire harness with the nut and screw grommet.

        Torque:
        4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
      6. for RHD:

        Install the wire harness clamp holder with the bolt.

      7. for RHD:

        Connect the wire harness with the wire harness clamp holder.

    3. Rear Side:


      1. Install the glow plug wire harness with the nut and screw grommet.

        Torque:
        4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
      2. w/ DPF:

        Connect the 3 connectors.

      3. w/o DPF:

        Connect the connector.

      4. Install the engine wire harness protector with the 2 bolts.

      5. Install the 2 ground wires with the 2 bolts.

        Torque:
        8.4 N*m  { 87 kgf*cm, 74 in.*lbf }
      6. Attach the wire harness clamp.

  45. INSTALL NO. 4 WATER BY-PASS PIPE


    1. w/ EGR System:


      1. w/o DPF:

        Connect the No. 7 water by-pass hose to the No. 4 water by-pass pipe, and slide the clamp to secure the hose.

      2. Connect the water inlet hose to the No. 4 water by-pass pipe, and slide the clamp to secure the hose.

      3. Connect the water hose to the water by-pass pipe, and slide the clamp to secure the hose.

      4. Connect the No. 4 water by-pass hose to the No. 3 water by-pass pipe, and slide the clamp to secure the hose.

      5. Install the No. 4 water by-pass pipe to the No. 3 intake manifold with the 2 bolts and nut.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }

        Tech Tips

        First tighten the 2 bolts and then tighten the nut.

    2. w/o EGR System:


      1. Connect the No. 7 water by-pass hose to the No. 4 water by-pass pipe, and slide the clamp to secure the hose.

      2. Connect the water inlet hose to the No. 4 water by-pass pipe, and slide the clamp to secure the hose.

      3. Connect the water hose to the water by-pass pipe, and slide the clamp to secure the hose.

      4. Install the No. 4 water by-pass pipe to the No. 3 intake manifold with the 2 bolts and nut.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }

        Tech Tips

        First tighten the 2 bolts and then tighten the nut.

  46. INSTALL NO. 3 WATER BY-PASS PIPE (w/o Viscous Heater)


    1. Install the No. 3 water by-pass pipe to the cylinder head cover sub-assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the water hose and No. 2 water by-pass hose to the No. 4 water by-pass pipe, and slide the 2 clamps to secure the hose.

  47. CONNECT FUEL HOSE


    1. w/ DPF:


      1. Connect the 2 fuel hoses to the fuel filter to injection pump fuel pipe sub-assembly, and slide the 2 clamps to secure the hose.

    2. w/o DPF:


      1. Connect the 2 fuel hoses to the fuel filter to injection pump fuel pipe sub-assembly, and slide the 2 clamps to secure the hose.

      2. Connect the fuel hose to fuel pipe sub-assembly, and slide the clamp to secure the hose.

  48. INSTALL AIR CLEANER PIPE


    1. Connect the air cleaner pipe to the intake air connector pipe.

    2. Install the air cleaner pipe to the No. 3 intake manifold with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    3. Tighten the hose clamp.

      Torque:
      6.3 N*m  { 64 kgf*cm, 56 in.*lbf }
  49. INSTALL HEATER WATER PIPE SUB-ASSEMBLY (w/ Viscous Heater)


    1. Install the heater water pipe sub-assembly to the air cleaner pipe and cylinder head cover sub-assembly with the 4 bolts.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    2. Connect the 4 water hoses to the viscous with magnet clutch heater assembly, No. 4 water by-pass pipe and No. 2 water by-pass pipe, and slide the 4 clamps to secure the hose.

  50. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY


    1. Connect the No. 2 air cleaner pipe sub-assembly to the No. 2 intake air connector pipe.

    2. Connect the ventilation hose to the oil separator assembly.

    3. Install the No. 2 air cleaner pipe sub-assembly to the No. 3 intake manifold with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    4. Tighten the hose clamp.

      Torque:
      6.3 N*m  { 64 kgf*cm, 56 in.*lbf }
  51. INSTALL NO. 4 AIR TUBE


    1. B0019TOE05
      Text in Illustration
      *a Paint Mark
      *b Top

      Install the No. 4 air tube to the air tube support with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Tighten the hose clamp.

      Torque:
      6.3 N*m  { 64 kgf*cm, 56 in.*lbf }

      Tech Tips

      Make sure the direction of the hose clamp is as shown in the illustration.

    3. Install the suction hose sub-assembly to the No. 4 air tube with the bolt.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
  52. INSTALL NO. 2 AIR HOSE


    1. B001944E02
      Text in Illustration
      *a Protrusion
      *b Paint Mark
      *c Top

      Connect the No. 2 air hose to the No. 4 air tube with the hose clamp.

      Torque:
      6.3 N*m  { 64 kgf*cm, 56 in.*lbf }

      Tech Tips


      • Align the paint mark of the No. 2 air hose with the protrusion and push on the No. 2 air hose so that distance B is 0 to 3.0 mm (0 to 0.118 in.).

      • Position the clamp so that distance A is 2.0 to 6.0 mm (0.0787 to 0.236 in.).

      • Make sure the direction of the hose clamp is as shown in the illustration.

  53. INSTALL NO. 3 AIR TUBE


    1. B00182VE05
      Text in Illustration
      *a Paint Mark
      *b Top

      Install the No. 3 air tube to the intake air connector bracket with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Tighten the hose clamp.

      Torque:
      6.3 N*m  { 64 kgf*cm, 56 in.*lbf }

      Tech Tips

      Make sure the direction of the hose clamp is as shown in the illustration.

    3. Install the wire harness bracket with the bolt.

    4. Install the ground wire with the nut, and attach the wire harness clamp.

      Torque:
      8.4 N*m  { 85 kgf*cm, 74 in.*lbf }
  54. INSTALL NO. 1 AIR HOSE


    1. B0018JDE02
      Text in Illustration
      *a Protrusion
      *b Paint Mark
      *c Top

      Connect the No. 1 air hose to the No. 3 air tube with the hose clamp.

      Torque:
      6.3 N*m  { 64 kgf*cm, 56 in.*lbf }

      Tech Tips


      • Align the paint mark of the No. 1 air hose with the protrusion and push on the No. 1 air hose so that distance B is 0 to 3.0 mm (0 to 0.118 in.).

      • Position the clamp so that distance A is 2.0 to 6.0 mm (0.0787 to 0.236 in.).

      • Make sure the direction of the hose clamp is as shown in the illustration.

  55. INSTALL INTAKE AIR CONNECTOR


    1. Connect the intake air connector to the air cleaner pipe and No. 2 air cleaner pipe sub-assembly.

    2. Install the intake air connector to the timing chain cover sub-assembly with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    3. Tighten the 2 hose clamps.

      Torque:
      6.3 N*m  { 64 kgf*cm, 56 in.*lbf }
    4. Attach the 3 wire harness clamps.

    5. w/o Viscous Heater:


      1. Connect the connector to the water temperature sensor.

    6. w/ Viscous Heater:


      1. Connect the 2 connectors to the water temperature sensor and viscous with magnet clutch heater assembly.

  56. TEMPORARILY INSTALL NO. 1 AIR CLEANER HOSE


    1. Temporarily install the No. 1 air cleaner hose to the intake air connector.

  57. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. Connect the air cleaner cap sub-assembly to the No. 1 air cleaner hose, and install the air cleaner cap sub-assembly with the 4 clamps.

    2. Connect the mass air flow meter sub-assembly connector and attach the wire harness clamp to the air cleaner cap sub-assembly.

    3. Align the protrusion of the air cleaner cap sub-assembly and the concave portion of the No. 1 air cleaner hose.

    4. Tighten the 2 hose clamps.

      Torque:
      2.5 N*m  { 25 kgf*cm, 22 in.*lbf }
  58. INSTALL DIESEL THROTTLE BODY ASSEMBLY LH

    Click here

  59. INSTALL NO. 3 INTERCOOLER SUPPORT BRACKET

    Click here

  60. INSTALL NO. 1 GAS FILTER

    Click here

  61. INSTALL AIR TUBE SUB-ASSEMBLY LH

    Click here

  62. INSTALL DIESEL THROTTLE BODY ASSEMBLY RH

    Click here

  63. INSTALL AIR TUBE SUB-ASSEMBLY RH

    Click here

  64. INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE


    1. Apply a light coat of engine oil to a new O-ring.

    2. Install the O-ring to the No. 2 engine oil level dipstick guide.

    3. Install the No. 2 engine oil level dipstick guide to the cylinder head cover sub-assembly and air tube sub-assembly RH with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Connect the engine oil level dipstick guide oil hose to the cylinder head cover sub-assembly.

    5. Connect the wire harness clamp to the No. 2 engine oil level dipstick guide.

  65. CONNECT WATER HOSE SUB-ASSEMBLY


    1. w/ Viscous Heater:


      1. Connect the 6 water hose sub-assemblies to the heater water pipe sub-assembly, heater pipe and air conditioning radiator assembly, and slide the 6 clamps to secure the hoses.

    2. w/o Viscous Heater:


      1. Connect the 6 water hose sub-assemblies to the No. 3 water by-pass pipe, heater pipe and air conditioning radiator assembly, and slide the 6 clamps to secure the hoses.

  66. INSTALL INTERCOOLER ASSEMBLY

    Click here

  67. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.


    1. Connect the cables to the negative (-) main battery and sub-battery terminals.

  68. ADD ENGINE COOLANT

    Click here

  69. INSPECT FOR FUEL LEAK


  70. INSPECT FOR COOLANT LEAK

    Click here

  71. INSPECT FOR OIL LEAK

    Click here

  72. INSTALL UPPER RADIATOR SUPPORT SEAL

    Click here

  73. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

    Click here

  74. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

    Click here

  75. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

    Click here