ECM INSTALLATION

PROCEDURE


  1. INSTALL GASKET


    1. Clean the ECM seal surface with non-residue solvent.

    2. Install a new gasket to the ECM.

  2. INSTALL ECM


    1. Install the ECM with the 4 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }

      Note


      • Make sure the gasket is not folded or caught on any area on the surrounding part.

      • Make sure there is no foreign matter caught between the gasket and surrounding part.

      • Do not damage the gasket.

    2. B001AAH

      Connect the 2 ECM connectors and push each lock lever down to lock the ECM connectors.

      Note


      • Be careful not to allow dirt, water, or other foreign matter to adhere to the connecting parts when connecting the connectors.

      • Do not twist the wire harness when connecting the ECM connectors.

      • Make sure that the lock lever is raised 90° before connecting the ECM connectors. Failure to do this may cause the lock lever and terminals to break.

      • Make sure that the levers are securely locked.

  3. CONNECT CONNECTOR HOLDER BLOCK


    1. Connect the connector holder block with the 3 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  4. REGISTER INJECTOR COMPENSATION CODE


  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.