VACUUM SWITCHING VALVE(for Engine Mounting) INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


    1. Install the No. 1 vacuum switching valve assembly with the bolt.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
    2. Connect the 2 vacuum hoses to the No. 1 vacuum switching valve assembly.

    3. Connect the connector to the No. 1 vacuum switching valve assembly.