PROCEDURE
INSPECT NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 vacuum switching valve assembly.
Check the No. 1 vacuum switching valve assembly operation.
| *a | Filter |
| *b | Port F |
| *c | Port E |
| *d | Vacuum |
When applying vacuum to port E, check that air is sucked into the filter.
If the result is not as specified, replace the No. 1 vacuum switching valve assembly.
Apply voltage across the terminals.
| *a | Port F |
| *b | Port E |
| *c | Vacuum |
When applying vacuum to port F, check that air is sucked into port E.
If the result is not as specified, replace the No. 1 vacuum switching valve assembly.