HIGH PITCHED HORN INSTALLATION

PROCEDURE


  1. INSTALL HIGH PITCHED HORN ASSEMBLY


    1. B0019GZ

      Install the high pitched horn assembly with the bolt.

      Torque:
      19 N*m  { 194 kgf*cm, 14 ft.*lbf }
    2. Connect the connector.

  2. INSTALL UPPER RADIATOR SUPPORT SEAL

    Click here