IGNITION COIL AND SPARK PLUG INSTALLATION

PROCEDURE


  1. INSTALL SPARK PLUG


    1. Install the 8 spark plugs.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  2. INSTALL IGNITION COIL ASSEMBLY


    1. Install the 8 ignition coils with the 8 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. B001923E04
      *1 for Bank 1:
      *2 Engine Front
      *3 for Bank 2:

      Connect the 8 ignition coil connectors.

  3. CONNECT WATER A PIPE AND HOSE SUB-ASSEMBLY


    1. Connect the water A pipe and hose sub-assembly to the cylinder head cover with the 2 bolts.

      Torque:
      18 N*m  { 184 kgf*cm, 13 ft.*lbf }
  4. INSTALL AIR CLEANER ASSEMBLY

    Click here

  5. INSTALL AIR CLEANER HOSE ASSEMBLY

    Click here

  6. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  7. INSTALL UPPER RADIATOR SUPPORT SEAL

    Click here

  8. INSTALL NO. 2 ENGINE UNDER COVER

    Click here