POWER SWITCH INSPECTION

PROCEDURE


  1. INSPECT POWER SWITCH


    1. A000QHHE21
      Text in Illustration
      *a

      Component without harness connected

      (Power Switch)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Switch Condition Specified Condition

      5 (SS1) - 6 (AGND)

      1 (SS2) - 6 (AGND)

      Not pushed 10 kΩ or higher
      Pushed Below 1 Ω

      If the result is not as specified, replace the power switch.

    2. Apply battery voltage between the terminals of the switch, and check the illumination condition of the power switch.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) → Terminal 9 (SWIL)

      Battery negative (-) → Terminal 6 (AGND)

      Illuminates

      Tech Tips


      • If a positive (+) battery lead and a negative (-) battery lead are incorrectly connected, the power switch indicator light will not illuminate.

      • If the voltage is too low, the indicator light will not illuminate.

      If the result is not as specified, replace the power switch.