PROCEDURE
INSTALL OIL COOLER ASSEMBLY
Apply a light coat of engine oil to 2 new O-rings.
Install the 2 O-rings to the stiffening crankcase assembly.
Temporarily install the oil cooler assembly with the 2 nuts and 2 bolts.
Tighten the 2 bolts and 2 nuts in the order shown in the illustration.
|
Bolt |
|
Nut |
Connect the No. 8 water by-pass hose to the oil cooler assembly, and slide the clamp to secure the hose.
Connect the No. 7 water by-pass hose to the oil cooler assembly, and slide the clamp to secure the hose.
CONNECT NO. 5 INVERTER COOLING HOSE (for RHD)
Attach the clamp and connect the No. 5 inverter cooling hose to the front No. 1 stabilizer brace LH.
CONNECT WIRE HARNESS (for RHD)
Connect the ground wire to the bracket with the bolt.
Attach the 2 wire harness clamps.
CONNECT STEERING SLIDING WITH SHAFT YOKE SUB-ASSEMBLY (for LHD)
ADD ENGINE OIL
ADD ENGINE COOLANT
INSTALL NO. 2 INVERTER COOLING HOSE (for LHD)
Connect the No. 2 inverter cooling hose to the inverter with converter assembly, and slide the clamp to secure the hose.
Add inverter coolant Click here.
Inspect for coolant leak Click here.
INSPECT ENGINE OIL LEVEL
INSPECT FOR OIL LEAK
INSPECT FOR COOLANT LEAK
INSTALL NO. 2 ENGINE UNDER COVER
INSTALL FRONT SUSPENSION MEMBER BRACE
INSTALL REAR ENGINE UNDER COVER LH
INSTALL ENGINE UNDER COVER