CANISTER(w/ Canister Pump Module) REMOVAL

PROCEDURE


  1. REMOVE REAR NO. 1 FLOOR BOARD SUB-ASSEMBLY


    1. A000PZV

      Disconnect the 4 grommets and remove the 6 clips and rear No. 1 floor board.

      Text in Illustration
      B002B6O Clip A
      B002BBR Clip B
      B002BRO Grommet
  2. REMOVE CHARCOAL CANISTER ASSEMBLY


    1. A000N8M

      Disconnect the wire harness from the 3 clamps.

    2. A000NF1

      Disconnect the 2 quick connectors, purge line hose and connector.

    3. A000Q9Q

      Remove the 3 nuts and charcoal canister assembly.

  3. REMOVE CHARCOAL CANISTER BASE BRACKET


    1. A000SM3

      Remove the 2 bolts and charcoal canister base bracket.

  4. REMOVE CANISTER PUMP MODULE


    1. Before removing the canister pump module, clean the canister by blowing air into it to ensure that the canister is free of foreign matter.

      Note


      • Make sure to clean the canister using only air.

      • Do not use gasoline, thinners or solvents.

    2. A000R6ME03
      Text in Illustration
      *1 Protective Tape

      While disengaging the 2 claws as shown in the illustration, push the canister pump module upwards using a screwdriver to remove it.

      Tech Tips

      Tape the screwdriver tip before use.

    3. Check if the canister contains foreign matter such as mud or water.


      1. A000P5Z

        Visually check that the inside of the canister is free of foreign matter.

      2. Hold the canister upside down to make sure that the canister is free of foreign matter.

        If the canister contains foreign matter, replace the canister.