PROCEDURE
INSTALL EGR VALVE ASSEMBLY
INSTALL EGR COOLER ASSEMBLY
Install the EGR cooler assembly to the cylinder head sub-assembly with the 2 nuts and bolt.
Connect the No. 4 water by-pass hose to the EGR valve assembly and slide the clip to secure the hose.
Connect the No. 12 water by-pass hose to the EGR valve assembly and slide the clip to secure the hose.
Connect the No. 5 water by-pass hose to the EGR cooler assembly and slide the clip to secure the hose.
Connect the No. 6 water by-pass hose to the EGR cooler assembly and slide the clip to secure the hose.
INSTALL EGR VALVE BRACKET
Temporarily install the EGR valve bracket to the EGR valve assembly and cylinder head sub-assembly with the 2 bolts.
Tech Tips
Tighten the bolts until they are seated on the EGR valve bracket.
Tighten the 2 bolts in the order shown in the illustration.
INSTALL NO. 2 EGR PIPE
| *1 | No. 2 EGR Pipe Gasket |
| *a | Claws |
|
Nut |
|
Bolt |
Install a new No. 2 EGR pipe gasket to the No. 2 EGR pipe as shown in the illustration.
Note
Make sure that the gasket is installed in the correct direction.
Install a new EGR inlet gasket to the intake manifold.
Temporarily install the No. 2 EGR pipe to the EGR valve assembly and intake manifold with the 2 bolts and 2 nuts.
Tech Tips
Tighten the bolts and nuts until they are seated on the No. 2 EGR pipe.
Tighten the 2 nuts while pressing the No. 2 EGR pipe against the EGR valve assembly side.
Tighten the 2 bolts.
INSTALL ENGINE MOTOR CABLE CLAMP BRACKET
for RHD:
Install the engine motor cable clamp bracket to the EGR cooler assembly and cylinder head sub-assembly with the 2 bolts in the order shown in the illustration.
for LHD:
Install the engine motor cable clamp bracket to the EGR cooler assembly with the bolt.
INSTALL ENGINE ASSEMBLY