HV RELAY ASSEMBLY INSPECTION

PROCEDURE


  1. INSPECT HYBRID BATTERY JUNCTION BLOCK ASSEMBLY


    1. A000NCIE43
      Text in Illustration
      *1 (+) Terminal
      *2 (+) Connector
      *a

      Component without harness connected

      (Hybrid Battery Junction Block Assembly)

      Inspect SMRB


      1. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        (+) connector - (+) terminal Auxiliary battery voltage is not applied between terminals 4 (SMRB) and 2 (GND) 10 kΩ or higher
        (+) connector - (+) terminal Auxiliary battery voltage is applied between terminals 4 (SMRB) and 2 (GND) Below 1 Ω
      2. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        4 (SMRB) - 2 (GND) -40 to 176°F (-40 to 80°C) 20.6 to 40.8 Ω

        If the result is not as specified, replace the hybrid battery junction block assembly.

    2. A000NCIE44
      Text in Illustration
      *1 (-) Terminal
      *2 (-) Connector
      *a

      Component without harness connected

      (Hybrid Battery Junction Block Assembly)

      Inspect SMRG


      1. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        (-) connector - (-) terminal Auxiliary battery voltage is not applied between terminals 1(SMRG) and 2(GND) 10 kΩ or higher
        (-) connector - (-) terminal Auxiliary battery voltage is applied between terminals 1(SMRG) and 2(GND) Below 1 Ω
      2. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        1 (SMRG) - 2 (GND) -40 to 176°F (-40 to 80°C) 20.6 to 40.8 Ω

        If the result is not as specified, replace the hybrid battery junction block assembly.

    3. A000NCIE45
      Text in Illustration
      *1 (-) Terminal
      *2 (-) Connector
      *a

      Component without harness connected

      (Hybrid Battery Junction Block Assembly)

      Inspect SMRP and precharge resistor


      1. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        (-) connector - (-) terminal Auxiliary battery voltage is not applied between terminals 3(SMRP) and 2(GND) 10 kΩ or higher
        (-) connector - (-) terminal Auxiliary battery voltage is applied between terminals 3(SMRP) and 2(GND) 28.5 to 31.5 Ω
      2. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        3 (SMRP) - 2 (GND) -40 to 176°F (-40 to 80°C) 140 to 290 Ω

        If the result is not as specified, replace the hybrid battery junction block assembly.