SUB RADIATOR INSTALLATION

PROCEDURE


  1. INSTALL RADIATOR ASSEMBLY


    1. A000QJ2E03
      Text in Illustration
      *a Upper
      *b 30°

      Attach the 2 claws to temporarily install the radiator assembly.

    2. Install the radiator assembly with the 2 bolts.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    3. Connect the 2 water hoses.

      Note


      • Make sure that the clip is positioned as shown in the illustration.

      • Do not remove the tape or plastic bags from the pipes and disconnected hoses until installation.

  2. INSTALL UPPER RADIATOR SUPPORT

    Click here

  3. CONNECT NO. 2 ENGINE ROOM WIRE

    Click here

  4. INSTALL HOOD LOCK ASSEMBLY (for RHD)

    Click here

  5. INSTALL HOOD LOCK ASSEMBLY (for LHD)

    Click here

  6. INSTALL HOOD LOCK RELEASE LEVER PROTECTOR

    Click here

  7. ADD COOLANT (for Inverter)

    Click here

  8. INSPECT FOR COOLANT LEAK (for Inverter)

    Click here

  9. INSTALL NO. 1 AIR CLEANER INLET

    Click here

  10. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  11. INSTALL ENGINE ROOM SIDE COVER

    Click here

  12. INSTALL ENGINE UNDER COVER

    Click here