IGNITION COIL AND SPARK PLUG INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips

Perform "Inspection After Repairs" after replacing the ignition coil or the spark plug Click here.

PROCEDURE


  1. INSTALL SPARK PLUG


    1. Install the 6 spark plugs.

      Torque:
      18 N*m  { 184 kgf*cm, 13 ft.*lbf }

      Note

      If a component has been dropped or subjected to a strong impact, replace it.

      Tech Tips

      Perform "Inspection After Repairs" after replacing the spark plug Click here.

  2. INSTALL IGNITION COIL ASSEMBLY

    Tech Tips

    Perform "Inspection After Repairs" after replacing the ignition coil Click here.


    1. for Bank 1:


      1. Install the 3 ignition coils with the 3 bolts.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }

        Tech Tips

        Perform "Inspection After Repairs" after replacing the ignition coil Click here.

      2. Connect the VVT sensor connector and 3 ignition coil connectors to connect the engine wire.

      3. Connect the clamp and install the 2 nuts.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. for Bank 2:


      1. Install the 3 ignition coils with the 3 bolts.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }

        Tech Tips

        Perform "Inspection After Repairs" after replacing the ignition coil Click here.

      2. Connect the manifold absolute pressure sensor connector, VVT sensor connector and 3 ignition coil connectors to connect the engine wire.

      3. Connect the 2 clamps and install the 3 nuts.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the inverter reservoir tank assembly with the 2 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    4. for RHD:

      Install the inverter bracket to the inverter with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    5. for RHD:

      Attach the 2 wire harness clamps to the inverter bracket.

  3. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE

    Click here

  4. INSTALL NO. 2 VENTILATION HOSE

    Click here

  5. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  6. INSTALL ENGINE ROOM SIDE COVER

    Click here

  7. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here