THROTTLE BODY REMOVAL

PROCEDURE


  1. REMOVE ENGINE ROOM SIDE COVER

    Click here

  2. REMOVE COOL AIR INTAKE DUCT SEAL

    Click here

  3. REMOVE V-BANK COVER SUB-ASSEMBLY

    Click here

  4. REMOVE ENGINE UNDER COVER

    Click here

  5. DRAIN ENGINE COOLANT

    Click here

  6. DISCONNECT NO. 2 VENTILATION HOSE


    1. A000SOU

      Disconnect the No. 2 ventilation hose from the cylinder head cover.

  7. REMOVE AIR CLEANER CAP WITH AIR CLEANER HOSE


    1. A000T4H

      Disconnect the mass air flow meter connector.

    2. Disconnect the clamp from the air cleaner.

    3. A000R0O

      Disconnect the VSV hose.

    4. A000Q1S

      Disconnect the 4 clamps.

    5. Remove the hose clamp and air cleaner cap with air cleaner hose.

  8. REMOVE THROTTLE BODY WITH MOTOR ASSEMBLY


    1. A000PDF

      Disconnect the throttle motor connector.

    2. Remove the 4 bolts and disconnect the throttle body with motor assembly from the intake air surge tank.

    3. A000PTD

      Disconnect the 2 water by-pass hoses from the throttle body with motor assembly.

    4. Remove the throttle body with motor assembly and gasket.