NETWORK GATEWAY ECU(for LHD) INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips

A bolt without a torque specification is shown in the standard bolt chart Click here.

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. Install the network gateway ECU with the 2 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    2. Install the No. 1 ECU integration bracket with the nut and bolt.

    3. Connect each connector.

  2. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

    Click here

  3. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY

    Click here

  4. INSTALL LOWER INSTRUMENT PANEL

    Click here

  5. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  6. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

    Click here

  7. INSTALL INSTRUMENT SIDE PANEL RH

    Click here

  8. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable some systems need to be initialized after the cable is reconnected Click here.

  9. INSTALL BATTERY SERVICE HOLE COVER LH

    Click here

  10. INSTALL DECK TRIM SIDE BOARD LH (w/o Spare Tire)

    Click here

  11. INSTALL DECK BOARD ASSEMBLY (w/o Spare Tire)

    Click here

  12. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY (w/ Spare Tire)

    Click here

  13. CHECK SRS WARNING LIGHT

    Click here