STEERING CONTROL ECU INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedures for the RHD and LHD.

  • The procedures listed below are for the LHD.

PROCEDURE


  1. INSTALL STEERING CONTROL ECU


    1. A000Y53E05

      Install the ECU with the 3 screws.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }

      Tech Tips


      • Align positioning boss A of the blower with the hole of the ECU.

      • Securely attach the hook B of the ECU to the blower.

    2. Connect the 3 ECU connectors.

  2. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

  4. INSTALL BATTERY SERVICE HOLE COVER LH

    Click here

  5. INSTALL DECK TRIM SIDE BOARD LH (w/o Spare Tire)

    Click here

  6. INSTALL DECK BOARD ASSEMBLY (w/o Spare Tire)

    Click here

  7. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY (w/ Spare Tire)

    Click here

  8. CHECK SRS WARNING LIGHT

    Click here

  9. PERFORM INITIALIZATION

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  10. PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION

    Click here.