ABSORBER CONTROL ACTUATOR(for Front Side) INSPECTION

PROCEDURE


  1. INSPECT ABSORBER CONTROL ACTUATOR


    1. A000VJZE02
      *1 Component without harness connected: (Absorber Control Actuator)

      Measure the resistance according to the value(s) in the table below.

      Standard resistance
      Tester Connection Condition Specified Condition
      1 (B+) - 3 (GND) Always 12.0 to 12.8 Ω
      2 (A+) - 3 (GND) Always
      4 (B-) - 3 (GND) Always
      5 (A-) - 3 (GND) Always
  2. CHECK ABSORBER CONTROL ACTUATOR OPERATION


    1. Check the absorber control actuator operation Click here.