CONTROL VALVE ASSEMBLY(for Front Side) INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 HEIGHT CONTROL VALVE SUB-ASSEMBLY


    1. A000XNN

      Install the height control valve with the 2 nuts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    2. A000TWL

      Connect the 3 height control tubes (Type 1) Click here.

    3. A000TFT

      Connect the height control tube (Type 2) Click here.

    4. Connect the connector.

  2. INSPECT FOR AIR LEAK

    Click here

  3. INSTALL FRONT BUMPER COVER

    Click here