SHIFT LOCK SYSTEM INSPECTION

PROCEDURE


  1. INSPECT SHIFT LOCK SOLENOID


    1. A000YX6E01
      *a Component without harness connected: (Shift Lock Solenoid)

      Measure the resistance according to the value in the table below.

      Tech Tips

      Disconnect the solenoid connector.

      Standard resistance
      Tester Connection Condition Specified Condition
      3 (SLS-) - 4 (SLS+) Always 104 to 126 Ω

      If the result is not as specified, replace the transmission floor shift assembly.

    2. A000YX6E02
      *a Component without harness connected: (Shift Lock Solenoid)

      Measure the resistance according to the values in the table below.

      Tech Tips

      Disconnect the solenoid connector.

      Standard resistance
      Tester Connection Condition Specified Condition
      1 (P+) - 2 (P-) Parking position switch pushed 10 kΩ or higher
      1 (P+) - 2 (P-) Parking position switch released Below 1 Ω

      If the result is not as specified, replace the transmission floor shift assembly.