HIGH PITCHED HORN INSTALLATION

PROCEDURE


  1. INSTALL HIGH PITCHED HORN ASSEMBLY


    1. for Type A:


      1. Connect the horn connector.

      2. Install the horn with the bolt.

        Torque:
        19 N*m  { 194 kgf*cm, 14 ft.*lbf }
    2. for Type B:


      1. Connect the horn connector.

      2. Install the horn with the bolt.

        Torque:
        19 N*m  { 194 kgf*cm, 14 ft.*lbf }
  2. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  3. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY

    Click here

  4. INSTALL ENGINE ROOM SIDE COVER LH

    Click here

  5. INSTALL ENGINE ROOM SIDE COVER RH

    Click here