BATTERY INSTALLATION

PROCEDURE


  1. INSTALL BATTERY CARRIER


    1. A000ZLU

      Install the battery carrier with the 3 bolts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  2. INSTALL AUXILIARY BATTERY


    1. A000U4Z

      Install the auxiliary battery.

    2. Install the No. 2 battery hold down clamp with the bolt.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    3. Install the battery clamp with the nut.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    4. Connect the thermistor sensor connector.

    5. Connect the battery room ventilation hose.

    6. Connect the cable to the auxiliary battery positive (+) terminal.

      Torque:
      5.6 N*m  { 57 kgf*cm, 50 in.*lbf }
    7. Connect the cable to the auxiliary battery negative (-) terminal.

      Torque:
      5.4 N*m  { 55 kgf*cm, 47 in.*lbf }

      Note

      When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  3. INSTALL BATTERY SERVICE HOLE COVER LH

    Click here

  4. INSTALL DECK TRIM SIDE BOARD LH (w/o Spare Tire)

    Click here

  5. INSTALL DECK BOARD ASSEMBLY (w/o Spare Tire)

    Click here

  6. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY (w/ Spare Tire)

    Click here