PURGE VALVE INSTALLATION

PROCEDURE


  1. INSTALL PURGE VSV


    1. A000Y4G

      Install the purge VSV with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Connect the 2 purge line hoses to the purge VSV.

    3. Connect the purge VSV connector.

  2. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here