MASS AIR FLOW METER INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips

When viewed from the rear of the engine assembly, Bank 1 is on the left side and Bank 2 is on the right side.

PROCEDURE


  1. INSTALL MASS AIR FLOW METER SUB-ASSEMBLY (for Bank 1)


    1. A000UYC

      Install the mass air flow meter sub-assembly with the 2 screws.

      Torque:
      0.8 N*m  { 8 kgf*cm, 7 in.*lbf }

      Note


      • If the screw is tightened excessively, the screw hole may be damaged.

      • Make sure the O-ring is not pinched.

  2. INSTALL MASS AIR FLOW METER SUB-ASSEMBLY (for Bank 2)


    1. A000XWE

      Install the mass air flow meter sub-assembly with the 2 screws.

      Torque:
      0.8 N*m  { 8 kgf*cm, 7 in.*lbf }

      Note


      • If the screw is tightened excessively, the screw hole may be damaged.

      • Make sure the O-ring is not pinched.

  3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY LH


    1. A000VXIE02
      *1 Hole

      Install the air cleaner cap sub-assembly LH.

      Torque:
      for hose clamp
      3.8 N*m  { 38 kgf*cm, 34 in.*lbf }

      Tech Tips

      Insert the protrusion of the air cleaner hose into the hole of the hose clamp.

  4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY RH


    1. A000UQ7E02
      *1 Hole

      Install the air cleaner cap sub-assembly RH.

      Torque:
      for hose clamp
      3.8 N*m  { 38 kgf*cm, 34 in.*lbf }

      Tech Tips

      Insert the protrusion of the air cleaner hose into the hole of the hose clamp.

  5. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here